UPT Perpustakaan UM

  • Beranda
  • Informasi
  • Repository UM
  • SIPADU UM
  • OPAC SIPADU

Pencarian Spesifik

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title

Tugas Akhir

Comparative analysis of quantity take off (qto) concrete volume in 3-storey residential buildings (luxury house) using microsoft excel and building information modeling (bim) revit method / DINDA NURUL FAJRIYAH

Fajriyah, Dinda Nurul - Nama Orang;

Abstrak
One of the technologies that can support the construction process is Building Information Modeling (BIM). Building Information Modeling (BIM) is a sophisticated technology system that combines important data at all stages of a construction project including the planning stage construction activities and maintenance. into a three-dimensional (3D) model. With the application of BIM technology all parties involved in the construction project can plan design and manage the project more accurately effectively and efficiently. The object of this research is a 3-Storey Residential Building ( Luxury House ) located in the Sekarsuli area North Klaten Central Java . This study aims to analyze the comparison of the results of Quantity Take Off (QTO) Concrete Volume using two different methods namely Microsoft Excel and BIM Revit . The method used in this research is a quantitative method using numerical data from the results of a Quantity comparison. Take Off (QTO) both methods. From the results of the Quantity comparison Take Off (QTO) obtained a certain percentage difference on the beam and sloof elements with a percentage difference of 1.043m3 . On the foundation element there is a difference in concrete volume of 0.011m3 . On the floor slab element there is a difference in concrete volume of 0.017m3 . While on the column element there is no difference in volume. Based on the percentage difference data it shows the level of accuracy of the Quantity calculation. Take Off (QTO) using BIM Revit is more accurate compared to Quantity calculations Take Off (QTO) using Microsoft Excel.


Informasi Detail
DDC
TUGAS AKHIR DIGITAL
Prodi
Universitas Negeri Malang. Program Studi Teknologi Rekayasa dan Pemeliharaan Bangunan Sipil, 2025.
Deskripsi Fisik
xi, 52 hlm. : ilus.
Bahasa
Indonesia
No Reg
0038/TA/25
Edisi
Tugas Akhir (Diploma)--Universitas Negeri Malang. 2025
Subjek
1. STRUKTUR GEDUNG - METODE MICROSOFT EXCEL
2. BUILDING STRUCTURE - MICROSOFT EXCEL METHOD

Pembimbing
1. Viola Malta Ramadhani, S.t., M.ars
Lampiran Berkas
You must be logged in to get fulltext


UPT Perpustakaan UM
  • Berita

Tentang Kami

TIM IT Perpustakaan 2023

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS

Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik