UPT Perpustakaan UM

  • Beranda
  • Informasi
  • Repository UM
  • SIPADU UM
  • OPAC SIPADU

Pencarian Spesifik

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title

Tugas Akhir

Perbandingan efisiensi waktu dalam pekerjaan pemasangan bata ringan dan bata merah / Ahmad Sulton Aria Bayu Sukmana

Sukmana, Ahmad Sulton Aria Bayu - Nama Orang;

Abstrak
ABSTRACT Sukmana Ahmad Sulton Aria Bayu. 2013.Comparison of Time Efficiency in The Installation of The Light Bricks and Red Bricks. Civil and ConstructionEngineering Study Program Civil Engineering Department UniversitasNegeriMalang. PembimbingDrs. Made Wena M.Pd. M.T Keywords Buttress Red Bricks Light Bricks Efficiency Buttress is one of pivotal point of a building. A need of these bricks led into new inovations in making bricks one of them is light bricks or light concretes. This thing becomes the base of this study by comparing the buttress which are arranged in a stack of red bricks with the light bricks as well. Timing is important in running a project. By timing it can be determined that a work is started at 08.000-15.30 WIB even to know the efficiency of a work if it managed unwell. The efficiency of making the light bricks and red bricks gained by undertaking observation which is taken from the installation of light bricks on building project. This study is aimed to know the comparison of time efficiency in the installation of the light bricks and red bricks. This study is taken from a case study on a running of building project of GedungBundar Al-Asy ari in Universitas Islam Malang and concretes factory building project. The accumulation results is gained that each two worker consisted of one worker and one bricklayer by an agglutinant. They can install a stack of light bricks 10m2and by the same couple worker with the red bricks resulted 7m2 in seven hours. By installing buttress under 4 5 meter and wide about 901m2 it is consuming eight days on the installing the light bricksthan red bricks. So it can be concluded that the installation of using the light bricks is eight days faster than the red bricks with ten workers on each group.


Informasi Detail
DDC
Rp 691.40683 SUK p
Prodi
Universitas Negeri Malang. Program Studi Diploma III Teknik Sipil dan Bangunan, 2017.
Deskripsi Fisik
vii, 37 lembar : il. , tab. ; 30 cm
Bahasa
Indonesia
No Reg
03784/KI/17
Edisi
Tugas Akhir (Diploma)--Universitas Negeri Malang. 2017
Subjek
1. BATUBATA, PEMASANGAN - KINERJA
2. CLAY MATERIALS - LABOR PRODUCTIVITY

Pembimbing
1. Made Wena
Lampiran Berkas
You must be logged in to get fulltext


UPT Perpustakaan UM
  • Berita

Tentang Kami

TIM IT Perpustakaan 2023

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS

Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik