Tugas Akhir

Penerapan metode top down pekerjaan basement pada tanah marine day dalam proyek pembangunan Grand Dharmahusada Lagoon Surabaya / Herzha Qayum Mayori

Mayori, Herzha Qayum - Nama Orang;

Abstrak
ABSTRACT Mayori Herzha Qayum. 2018. Application of the Top Down Method of Basement Work on Marine Day Land in Grand Dharmahusada Lagoon Development Project. Final Project D3 Program of Civil and Building Engineering Faculty of Engineering State University of Malang Advisor Drs. H. Suparno S.T. M.T Keywords The method of implementation top down marine day. The top-down method is the way in which the basement construction begins construction from top to bottom. The process of implementing this method begins with the work of bored pile foundation then king post after which the installation of diaphragm wall excavation and basement flooring and raft foundation work. This method is carried out in a condition where there are adjacent buildings nearby so it is feared to landslide if using bottom-up method. Based on the description this final project will examine more deeply about the application of top down method on Marine Day land in Grand Dharmahusada Lagoon development project. The aim of this study are (1) to know the implementation of the top down method of basement work of Grand Dharmahusada Lagoon Development project (2) to know the advantages and disadvantages of using top down construction methods on Marine Day soil type. The results of the field study are (1) The order of the Grand Dharmahusada Lagoon basement work using the top down method is as follows (a) For bored pile work the installation of reinforcement and tremor pipe is in accordance with the theory while drilling and casting are still less suitable (b) For the king post work the preparation and installation of the king post table is appropriate as the theory while the installation of king post on the king post table is still less appropriate (c) For the job of the diaphragm wall all of his work is still incompatible with the theory (d) For basement excavation works land clearing and slope stability checks on basement excavation works are in accordance with the theory whereas the excavation work is still less appropriate (e) For basement floor work and raft foundation work all of its work is in accordance with the theory. (2) The advantages of using the top down method for Marine Day soils are (a) Not disturbing the environment and the implementation schedule can be accelerated. The disadvantages are (b) Often there is a over excentrisity king post and specific knowledge is required to control the work.


Informasi Detail
DDC
Rp 693.5 MAY p
Prodi
Universitas Negeri Malang. Program Studi D3 Teknik Sipil Dan Bangunan, 2018.
Deskripsi Fisik
viii, 58 lembar : il., tab. ; 30 cm
Bahasa
Indonesia
No Reg
05136/KI/18
Edisi
Tugas Akhir (Diploma)--Universitas Negeri Malang, 2018
Subjek
1. BETON, KONSTRUKSI
2. CONCRETE, CONSTRUCTION

Pembimbing
1. Suparno
Lampiran Berkas
You must be logged in to get fulltext


UPT Perpustakaan UM
  • Berita

Tentang Kami

TIM IT Perpustakaan 2023

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS

Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik